Skip to content
Church parking lot with fresh yellow stall striping

Parking lot striping in Hannibal, MO and Quincy, IL

Clear markings make a lot work the way it was designed.

New layouts and restriping for stalls, arrows, accessible spaces, fire lanes, and loading areas, painted to a layout you approve.

What we mark

Layout, restriping, and everything painted on the surface.

Striping is the part of a parking lot that drivers actually obey. When markings fade, stalls get wider, aisles get tighter, and the lot quietly loses capacity. Restriping puts the design back in force without touching the pavement itself.

For a new layout we work from the plan you provide or lay out the stalls, aisles, and circulation with you before painting, so you see the arrangement before it is permanent.

  • New parking lot layouts
  • Restriping of existing layouts
  • Standard and compact stalls
  • Directional arrows and traffic flow
  • Accessible space markings and access aisles
  • Fire lanes, loading zones, and no-parking areas
  • Stall numbering and reserved spaces
  • Curb and bollard marking
Sealcoated commercial lot ready for fresh striping

Sequencing

Striping after sealcoating, not before.

Sealcoating covers markings, so the order matters. When both are on the schedule we coat first, let it cure, then stripe.

1. Repair and prep

Cracks filled and failures repaired so the surface is sound before anything decorative goes on it.

2. Sealcoat and cure

The protective coating goes down and is given the cure time the conditions require.

3. Stripe to layout

Stalls, arrows, and specialty markings are painted to the approved layout on a clean surface.

Note: we paint to an approved layout and to the requirements supplied for the project. We do not provide legal, code, or accessibility compliance certification.

Striping work

Layouts and markings we have applied.

Striping accessible stall blue by United Way Asphalt
Parking lot stripingStriping accessible stall blue
Striping accessible stall blue by United Way Asphalt
Parking lot stripingStriping accessible stall blue
Striping crosswalk markings by United Way Asphalt
Parking lot stripingStriping crosswalk markings
Striping fresh lot layout by United Way Asphalt
Parking lot stripingStriping fresh lot layout
Striping orange stall lines by United Way Asphalt
Parking lot stripingStriping orange stall lines
Striping yellow stalls by United Way Asphalt
Parking lot stripingStriping yellow stalls
Striping yellow stalls by United Way Asphalt
Parking lot stripingStriping yellow stalls
Striping yellow stalls by United Way Asphalt
Parking lot stripingStriping yellow stalls

Related services

What striping usually follows.

Crew finishing a freshly paved asphalt surface with a rake

Asphalt Paving

New asphalt surfaces and full replacement paving for residential driveways and commercial parking lots, built on properly graded and compacted base.

Asphalt Paving details
Freshly sealcoated commercial parking lot with a deep black finish

Sealcoating

A protective surface coating that shields asphalt from sun, water, and traffic wear while restoring a clean, uniform black finish.

Sealcoating details
Commercial property pavement undergoing repair and crack maintenance

Asphalt Repair & Crack Filling

Targeted repair of potholes, failing patches, edge breakup, and cracks so water stays out of the base and damage stops spreading.

Asphalt Repair & Crack Filling details
Paving equipment working on a prepared rural site

Grading & Site Preparation

Dirt work, excavation, rough and final grading, subgrade correction, and base preparation so the pavement above it has something solid to sit on.

Grading & Site Preparation details

Striping questions

Parking lot striping FAQs.

If you need something specific, call or text us and we can talk it through.

Text us your question
Do you stripe over an existing layout or create a new one?

Both. Restriping follows the existing layout where it still works. For a new layout we lay out stalls, aisles, and traffic flow to an approved plan before anything is painted.

Does striping happen before or after sealcoating?

After. Sealcoating covers existing markings, so striping goes down once the coating has cured. Planning both together saves a mobilization.

Can you mark accessible spaces and fire lanes?

Yes. We install accessible space markings, fire lane markings, loading and no-parking zones, arrows, and stall numbering according to the layout and project requirements you provide or approve.

Will you guarantee code or ADA compliance?

No. We paint to an approved layout and to the requirements provided for the project. Verifying the layout against local code and applicable accessibility requirements stays with the property owner or their designer.

How often should a lot be restriped?

It depends on traffic volume, plow activity, and sun exposure. Most lots need refreshing when markings fade enough that drivers stop respecting the layout.

Get a free striping estimate.

Residential or commercial, in Hannibal, Quincy, or the surrounding region. Tell us about the project and we will take a look.